Inspection: ensure your cooling tower is up to the task

Regular inspection of HVAC systems is vital to ensure they are functioning well, are in good condition, and ready to deliver dependable service in the coming year.

von | 12.07.21

Regular inspection of HVAC systems is vital to ensure they are functioning well, are in good condition, and ready to deliver dependable service in the coming year.

An annual inspection of evaporative cooling systems, such as cooling towers, is recommended as warm weather arrives and these systems begin working at full capacity. Now is the time to review your cooling tower user manual and inspect all components.

It’s important to consult with your safety officer and follow all safety protocols before beginning the inspection process. Always shut off electrical power to the cooling tower fan motor using lockout/tag out procedures before proceeding.

A thorough cooling tower inspection involves using a methodical process to review and document the condition of multiple components and systems. The checklist below is based on our experience and comprises recommendations in several important areas.

TOWER CASING

  • Inspect the exterior of the tower for leaks and cracks. We recommend walking around the tower twice.
  • First, be aware of trip hazards as you focus on the lower portion of the tower.
  • The second time around, look higher for cracks and leaks, signs of vibration and loose hardware, and the presence of rust or biological fouling could indicate a damaged water distribution system.

LOUVERS, HEAT TRANSFER FILL & DRIFT ELIMINATORS

  • Check louvers for deterioration and excess scale build-up.
  • Inspect the fill media for excess scale, algae, and other contaminants. Some light scale is typical on fill and can be removed with brushing in a crossflow application. Inspection of counterflow fill can be performed using an endoscopic camera. If the fill is heavily scaled or damaged, tower performance will be adversely affected.
  • Drift eliminators should be clean and free of debris. Ensure the seals are in place and in good condition.

COLD WATER BASIN

  • It is vital that your cold water basin and anti-vortex screens are properly placed and free of debris.
  • If your cold water basin includes equipment such as basin sweepers that go to side filtration, check nozzle placement to ensure proper water flow.
  • Inspect water level probes, whether manual or electronic, for corrosion.
  • When the basin is clean and components are operational, refill the cold water basin to the recommended operating level.

HOT WATER BASIN (If applicable)

Remove the basin covers to clean the water distribution system basin and nozzles. Then properly secure the covers.

WATER DISTRIBUTION PIPEWORK

Check that all pipes are positioned correctly and secure.

Check that all the nozzles or spray arms are installed correctly.

Tip: (Counterflow application) Removal of an air inlet panel at low level during operation can allow you visibility of the flow from the underside of the fill pack. Any areas of noticeable heavy flow may be the result of a dislodged lateral pipe or missing nozzle.

(Crossflow application) Noticeable dry spots on the fill media may be the result of a blocked nozzle in the hot water basin.

PIPING

Check all supply and return piping to and from the tower; confirm valves are open and the water treatment system is operating properly.

Mechanical Equipment – Fan, Motor, Gearbox or Belt Drive, and Driveshaft

FAN:

  • Check the fan; blades must turn freely with equal tip clearance between the blade and the shroud.
  • Verify blade pitch to eliminate vibration. Ensure the blade angle is consistent across all blades.
  • Check that the fan drain holes are clear.

MOTOR:

  • Turn the motor manually and confirm hardware is tight and free of corrosion.
  • Moisture and heat are detrimental to motors. Check that open drain holes match motor orientation.

BELT DRIVE:

  • Check tension and wear on your belt drive.
  • Inspect pulleys for corrosion and loss of metal in the grooves.

GEARDRIVE:

  • Check oil level.
  • Check oil appearance for cloudiness or particulates, signs of water and other contamination.
  • Check and lubricate bearings.
  • Check seals for signs of leakage.

DRIVESHAFT:

  • Check alignment of driveshafts and couplings.
  • Inspect for corrosion and damage.
  • Check rubber components for cracks and brittleness.

Bildquelle, falls nicht im Bild oben angegeben:

(Source: SPX Cooling Technologies UK Ltd.)

Jetzt Newsletter abonnieren

Stoff für Ihr Wissen, jede Woche in Ihrem Postfach.

Hier anmelden

Vorflutkanal in Witten-Stockum auf 2,5 Kilometern grabenlos saniert
Vorflutkanal in Witten-Stockum auf 2,5 Kilometern grabenlos saniert

In Witten-Stockum wurde der Vorflutkanal auf einer Länge von rund 2.500 Metern im TIP-Lining-Verfahren saniert. Die Maßnahme umfasste insgesamt 52 Kanalhaltungen sowie zahlreiche Seitenzuläufe und Schächte. Besondere Herausforderungen stellten die geringe Überdeckung des Kanals und die erforderliche Abwasserüberleitung während der Bauarbeiten dar.

mehr lesen
„Das Abwasser spiegelt unsere Lebensweise wider“
„Das Abwasser spiegelt unsere Lebensweise wider“

Seit April 2025 ist die vierte Reinigungsstufe der Kläranlage Dortmund-Deusen in Betrieb. Prof. Dr. Issa Nafo von Emschergenossenschaft und Lippeverband (EGLV) erläutert die Erfahrungen mit Pulveraktivkohle und Tuchfiltration sowie die Bedeutung des Standorts für die Emscher. Im Interview erklärt er außerdem, wie sich weitere Anlagen gezielt ausbauen lassen und warum wirksamer Gewässerschutz bereits an der Quelle beginnt.

mehr lesen

Passende Firmen zum Thema:

Sie möchten die gwf Wasser + Abwasser testen

Bestellen Sie Ihr kostenloses Probeheft

Überzeugen Sie sich selbst: Gerne senden wir Ihnen die gwf Wasser + Abwasser kostenlos und unverbindlich zur Probe!

Finance Illustration 03